Innovative, cost-effective Glulam timber engineering solutions

Glulam Feature Trusses successfully delivered to Haverfordwest Castle.

Getting the Trusses to the site was a challenge as the access was very tight and not accessible by an articulated vehicle, so our smaller vehicle carried the 12.2m Glulam Feature Trusses the last 150m. 

We’re looking forward to seeing them in place at the project’s flagship Visitor Centre.

Dormers logo
Supply & Fit logo
SIPS logo
Spandrel panels logo
Posi joist logo
Glulam logo
Feature truss logo
Gable panels logo
FASTRACK logo
Roof & floor cassettes logo